GEOLOGICAL AND GEOTECHNICAL INVESTIGATIONS FOR THE CONSTRUCTION OF THE HIGHWAY TUNNEL THROUGH DEBELI HRIB NEAR LJUBLJANA. PROCEEDINGS - 1ST YUGOSLAV SYMPOSIUM ON TUNNELS, VOLUMES 1 AND 2

GEOLOSKO GEOTEHNICKE RAZISKAVE ZA IZDELAVO AVTOCESTNEGA PREDORA SKOZI DEBELI HRIB PRI LJUBLJANI

The paper presents the results obtained and the conclusions made based on rock investigation for the construction of a 35o m long highway tunnel, situated about 10 km East of ljubljana. Due to the poor geotechnical characteristics at the western tube of the tunnel, the line had to be moved approximately 20 m to the East. This new location was subsequently examined and found satisfactory. For the covering abstract of the conference see IRRD 829277.

  • Corporate Authors:

    Savez Drustava za Tunele Jugoslav & Dru za Tun Hrv

    Rakusina 1
    Zagreb, Croatia,   Yugoslavia 
  • Authors:
    • Petkovsek, B
  • Publication Date: 1988

Language

  • Undetermined

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00606185
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: ITRD, TRIS
  • Created Date: Mar 31 1991 12:00AM