GREATER SAFETY THROUGH LINEAR CONTROL OF TRAINS

SECURITE ACCRUE PAR LE CONTROLE LINEAIRE DES TRAINS

A short description of the integrated transmission system designed by the ORE. The tests were begun on the Lavorgo-Bodio (St-Gothard) line, with RE 4/4 II type locomotives. Further tests are planned on the Turgi-Coblenz section with one of the new RABDe 8/16 type suburban trainsets. The system as a whole will be thoroughly tested between now and 1977, so that large-scale production can be begun at that date.

  • Supplemental Notes:
    • Also published in German.
  • Authors:
    • WINTER, P
  • Publication Date: 1975

Language

  • French

Media Info

  • Features: Figures;
  • Pagination: p. 64-67
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00126981
  • Record Type: Publication
  • Source Agency: International Railway Documentation, Selection of
  • Files: TRIS
  • Created Date: Nov 18 1976 12:00AM