CONTROLLING TRACK SETTLEMENT AS AN INTEGRATED OPERATION OF THE LINING AND TAMPING-CYCLE

Despite consolidation of track, an immediate gradual settlement takes place once the line is opened to traffic. To minimize this, Plasser & Theurer's dynamic stabilizing group can make a substantial contribution when operated in conjunction with the lining and tamping machine to which it is coupled.

  • Availability:
  • Corporate Authors:

    Broadfields (Technical Publishers) Limited

    Little Leighs
    Chelmsford, Essex CMB 1PM,   England 
  • Publication Date: 1975-6

Media Info

  • Features: Figures; Photos;
  • Pagination: p. 165-166
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00126450
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Nov 5 1976 12:00AM