PAST AND FUTURE OF CONTRACT ADMINISTRATION

Past and current contract administration activities have been and are unsatisfactory. In particular, relationships between the parties have deteriorated over the past 10 to 15 yr. This trend must be reversed. Engineers, individually and as a group, must participate to a much greater degree than in the past in solving the problems. The existing situation and its historical background, and problems that require study and resolution are examined. /ASCE/

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00126133
  • Record Type: Publication
  • Report/Paper Numbers: ASCE #11560 Proceeding
  • Files: TRIS
  • Created Date: Oct 18 1975 12:00AM