NS SAVANNAH GALVESTON OUTAGE REPORT

A summary of modifications, maintenance, and inspection work performed on the N.S. Savannah during the Galveston outage of February, March, and April, 1963 is presented. Evaluation of the operational history and equipment performance since the start of the reactor operation resulted in recommended changes in the ship and power plant. Major modifications included replacement of the reactor compartment ventilation system, replacement of the radiation monitoring system, and addition of new quarters in the no. 6 hold. Routine equipment maintenance and repair items were scheduled. An extensive inspection and preventive maintenance program was performed on a daily, weekly, monthly, quarterly, semiannual, and annual basis. Inspections required by the U.S. Coast Guard and the American Bureau of Shipping were performed at this time.

  • Supplemental Notes:
    • This document is available for review at the Department of Commerce Library, Main Commerce Building, Washington, D.C., under reference number STS-2.
  • Corporate Authors:

    Babcock and Wilcox Company

    N.S. Savannah Technical Staff
    Galveston, TX  United States 

    Todd Shipyards Corporation

    Los Angeles Division
    San Pedro, CA  United States 
  • Publication Date: 1963-11

Media Info

  • Features: Appendices; Figures; Tables;
  • Pagination: 159 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00026637
  • Record Type: Publication
  • Source Agency: Maritime Administration
  • Report/Paper Numbers: STS-2
  • Contract Numbers: MA-3377
  • Files: TRIS, USDOT
  • Created Date: Feb 14 1973 12:00AM