INSTALLATION OF ALTERNATING CURRENT CATENARY NETWORK EXPERIENCE OF THE ENGINEERING AND INSTALLATION TRAIN

MONTAZH KONTAKTNOI SETI PEREMENNOGO TOKA. OPYT KOLLEKTIVA, STROITEL'NA MONTOAZHNOG POEZDA

This book presents the makeup and general work organization for assembly of the alternating current catenary network. (1) "Basic means and apparatus" discusses parameters and norms, quality control of bearings, transport of materials and equipment on railroad runs and stations, work production methods, preparation of catenary network for operation. (2) "Supporting arrangement assembly" presents mounting of cantilevers, corbels for 25 kV. specified track conductor feeders, reverse current, stiff and flexible cross bars, spilicing, combined methods, cross braces and carrier anchorings. (4) "Regulation of chain suspensions on railroad runs" includes mounting central anchorings, mounting locks with regulation of zigzags, catenary conductor height, and electrical joints. (5) "Assembly and regulation of catenary networks at stations" covers aerial switches, fixed spans, simple suspension, unrolling, anchoring, and interlinking without setting carrying cable on bearings, replacing chain suspension of outgoing sidings on extensions and sorting routes. (6) "Installation of sectioning apparat includes feeding and sectioning layout, mounting aerial intervals and sectioning isolators and disconnecting switches, remote control cables and coupling. (7) "Grounding bearings of catenary network and lightning protection" covers mounting individual groundings of bearings, group groundings, and tubular dischargers. (8) "Assembly of 25 kV. transmission line conductors, feeding conductors, and reverse current conductors includes assembly of complete transformer substations, feeding, outlet and reverse current conductors, and intermediate conductors across railroad paths. (9) "Assembly of catenary suspensions in synthetic constructions" includes bridges, tunnels, viaducts, and signal bridges. (10) "AC and DC catenary network junctions" covers distribution grouping points and feeding traction lines. Finally, (11) "Preparation for construction and components for catenary network in mechanical workshops" discusses cross brace production and making up a set of locks.

  • Supplemental Notes:
    • Abstract only is available in English, original untranslated as of November 1976.
  • Corporate Authors:

    Transport Publishing House

    Basmannyi Tupik 6A
    Moscow B-174,   USSR 
  • Authors:
    • Koptev, A
  • Publication Date: 1965

Language

  • Russian

Media Info

  • Features: Figures; Tables;
  • Pagination: 148 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00130059
  • Record Type: Publication
  • Source Agency: Federal Railroad Administration
  • Report/Paper Numbers: No. 259
  • Files: TRIS, USDOT
  • Created Date: Dec 1 1977 12:00AM