BRIDGES ON THE LUPOGLAV-BORUT-CEROVLJE ROAD
MOSTOVI NA CESTI LUPOGLAV-BORUT-CEROVLJE
The article describes the design and construction of bridges on the Lupoglav-Borut-Cerovlje road. The same construction method, i.e. precast prestressed concrete beams with partially cast in situ slab has been used for the construction of six viaducts, the largest among them being 480 m long. It describes in detail the choice of a structural system and the one proposed in 1982, i.e. precast prestressed u-beams joined with partially cast in situ reinforced concrete slab, forming a twin box girder. Two novelties were used for the construction of a bridge deck: partial prestressing and omission of the cross beams, even above supports. The article also contains essential data on all six viaducts and material quantities related to the unit bridge area.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/04116380
-
Corporate Authors:
Druste za Ceste Hrvatske
U1 Janka Rukuse 1
Zagreb, Croatia, Yugoslavia -
Authors:
- MARIC, Z
- Velan, D
- Publication Date: 1988
Language
- Undetermined
Media Info
- Pagination: p. 437-446
-
Serial:
- CESTE I MOSTOVI
- Volume: 34
- Issue Number: 10
- Publisher: HRVATSKO DRUSTVO ZA CESTE
- ISSN: 0411-6380
Subject/Index Terms
- TRT Terms: Beams; Bridge decks; Bridges; Cast in place concrete; Construction; Construction management; Design; Precast concrete; Prestressed concrete; Prestressing
- Geographic Terms: Yugoslavia
- Subject Areas: Bridges and other structures; Construction; Design;
Filing Info
- Accession Number: 00498164
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Report/Paper Numbers: 11/12
- Files: ITRD, TRIS
- Created Date: Sep 30 1990 12:00AM