PROCEDURES MANUAL. VOLUME 2: MAINTENANCE AND REPAIR PROCEDURES

Procedures are detailed for maintenance and repair of the N.S. Savannah. Instructions are given for connecting shore power, steam and water to the ship; drydocking the ship; and removing and replacing, inspecting, repairing, installing and disassembling various power plant components.

  • Supplemental Notes:
    • This document is available for review at the Department of Commerce Library, Main Commerce Building, Washington, D.C., under reference number T-6-P-Vol-2. See MRIS-026489, Vol 1.
  • Corporate Authors:

    Todd Shipyards Corporation

    Nuclear Division, PO Box 1600
    Galveston, TX  United States  77550
  • Publication Date: 1962-11

Media Info

  • Pagination: 310 p.
  • Serial:
    • Volume: 2

Subject/Index Terms

Filing Info

  • Accession Number: 00026490
  • Record Type: Publication
  • Source Agency: Maritime Administration
  • Contract Numbers: MA-2206
  • Files: TRIS, USDOT
  • Created Date: Feb 14 1973 12:00AM