UNDERWATER TUNNEL CONSTRUCTION WITH PRECAST CONCRETE ELEMENTS
GRADNJA TUNELA U PODMORJU S MONTAZNIM BETONSKIM SEGMENTIMA
The article describes the construction of four undersea tunnels with their specific properties and differences as well as the technical and technological solutions adopted: the Parana -Santa Fe road tunnel constructed in soil, the Elba road tunnel in Hamburg constructed in soil, the Conveyor Bakar tunnel in Yugoslavia constructed on piles and the Karamoej pipeline tunnel in Norway also constructed on piles. (TRRL)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/04116380
-
Corporate Authors:
Druste za Ceste Hrvatske
U1 Janka Rukuse 1
Zagreb, Croatia, Yugoslavia -
Authors:
- Bojcic, B
- CANDRLIC, V
- Publication Date: 1988
Language
- Croatian
Media Info
- Pagination: p. 123-134
-
Serial:
- CESTE I MOSTOVI
- Volume: 34
- Issue Number: 3
- Publisher: HRVATSKO DRUSTVO ZA CESTE
- ISSN: 0411-6380
Subject/Index Terms
- TRT Terms: Construction; Construction management; Highways; Piles (Supports); Pipe; Precast concrete; Seas; Soils; Technology; Tunnels; Underwater construction; Underwater structures
- Geographic Terms: Germany; Norway; United States; Yugoslavia
- ITRD Terms: 3655: Construction; 3666: Construction method; 8125: Germany; 2755: Highway; 8084: Norway; 3399: Pile; 3361: Pipe; 4792: Precast concrete; 4368: Sea; 4156: Soil; 3855: Technology; 3374: Tunnel; 3626: Underwater; 8122: USA; 8128: Yugoslavia
- Subject Areas: Bridges and other structures; Construction; Geotechnology; Highways;
Filing Info
- Accession Number: 00493338
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Files: ITRD, TRIS
- Created Date: Apr 30 1990 12:00AM