PAVETECH BRIDGE JOINT SYSTEM EVALUATION. CONSTRUCTION REPORT

This report covers the construction of the "PAVETECH BRIDGE JOINT SYSTEM" on a bituminous asphalt overlayed bridge deck on SR 0061 in Berks County. The joint is designed to allow horizontal, vertical, and rotational movements as well as be a waterproof barrier. The construction of the joint was a simple and straightforward process. A pavement saw, hot-air lance, asphalt buggy, mixer, and roller was all the equipment needed for construction. The rate of construction was slow due to this being only a demonstration project. Larger equipment could speed the construction rate. The quoted installation price is less than other approved joint repairs. The joint life expectancy is 6 years or longer.

  • Corporate Authors:

    Pennsylvania Department of Transportation

    Bureau of Bridge and Roadway Technology, T&S Bldg, Room 1009
    Harrisburg, PA  United States  17120
  • Authors:
    • Ramirez, T L
  • Publication Date: 1990-2

Media Info

  • Features: Appendices; Figures; Photos;
  • Pagination: 18 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00493699
  • Record Type: Publication
  • Report/Paper Numbers: PA-89-032+90-53, RP 90-53
  • Files: TRIS, STATEDOT
  • Created Date: Apr 30 1990 12:00AM