DAY AND NIGHT HUSTLE HELPS I-40 PROJECT ALONG. ASPHALT RECYCLING AND RECLAIMING SPECIAL REPORT
The article describes how work around the clock, 6 days a week, has helped a milling, widening and resurfacing project on I-40 between Raleigh and Durham, North Carolina, and kept the project 18% ahead of schedule despite bad weather and soil problems. Details of the three project phases are described. Conditions caused by the original construction led to the need to find subgrade stabilization alternatives. The existing drainage system is being used with a few alterations for added lanes. Extra drainage structures are being added. Stage III of the project will start in April 1990. Concern for public safety led to the decision to do night work.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/11660022
-
Corporate Authors:
Scranton Gillette Communications
380 E Northwest Highway, Suite 200
Des Planes, IL United States 60016-2282 -
Authors:
- Heine, M
- Publication Date: 1989-10
Media Info
- Pagination: p. 38-39
-
Serial:
- Roads & Bridges
- Volume: 27
- Issue Number: 10
- Publisher: Scranton Gillette Communications
- ISSN: 8750-9229
- Serial URL: http://www.roadsbridges.com/rb/
Subject/Index Terms
- TRT Terms: Asphalt; Construction safety; Construction scheduling; Highways; Improvements; Milling; Night; Pavements; Recycling; Resurfacing; Soil stabilization; Subgrade (Pavements); Surface drainage
- Uncontrolled Terms: Stabilization
- Old TRIS Terms: Highway drainage; Recycled pavements
- Subject Areas: Geotechnology; Highways; Materials; Pavements; Safety and Human Factors; I31: Bituminous Binders and Materials;
Filing Info
- Accession Number: 00490275
- Record Type: Publication
- Files: TRIS
- Created Date: Dec 31 1989 12:00AM