FAST CURE FOR AILING COUNTY BRIDGE DECK
The fast setting of a bridge deck replacement on a chilly April day in Indiana is described. A new deck was placed on an overcast, blustery day using a new proprietary blended hydraulic cement, Pyrament. The primary considerations in its use were quick turnaround of the bridge deck, and long-term durability. Details of the construction are briefly noted. The concrete was batched just as conventional concrete. The plastic concrete was pumped and distributed over rebar ahead of a deck finisher. Other details of the construction are noted. Anticipated resistance of the cured Pyrament concrete to chloride ion penetration permitted use of reinforcing steel without epoxy coating.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/11660022
-
Corporate Authors:
Scranton Gillette Communications
380 E Northwest Highway, Suite 200
Des Planes, IL United States 60016-2282 -
Authors:
- Kuennen, T
- Publication Date: 1989-6-6
Media Info
- Pagination: p. 77
-
Serial:
- Roads & Bridges
- Volume: 27
- Issue Number: 6
- Publisher: Scranton Gillette Communications
- ISSN: 8750-9229
- Serial URL: http://www.roadsbridges.com/rb/
Subject/Index Terms
- TRT Terms: Bridge decks; Chlorides; Cold weather construction; Concrete; Concrete construction; Concrete placing; Pendulum tests; Repairing
- Uncontrolled Terms: Repairs
- Subject Areas: Bridges and other structures; Highways; Maintenance and Preservation; I60: Maintenance;
Filing Info
- Accession Number: 00485204
- Record Type: Publication
- Files: TRIS
- Created Date: Jun 30 1989 12:00AM