SUBSURFACE INVESTIGATION, SECTION E-002, GREENBELT ROUTE

Results are presented of 14 test pits made adjacent to the line of Section E002, on U Street and 14th Street N.W. in Northwest Washington, D.C., of the Washington Metropolitan Area Metro System. The purpose of the work was to provide information on the characteristics of existing building foundations for the design of underpinning or building protection in preparation for excavation of the subway in the streets. The report contains sketches illustrating the test pits, results of laboratory tests on hand-cut undisturbed samples, and a discussion of the general subsurface and foundation conditions.

  • Supplemental Notes:
    • Sponsored in part by Washington Metropolitan Area Transit Authority, D.C.
  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  USA 

    Washington Metropolitan Area Transit Authority

    950 l'Enfant Plaza, SW
    Washington, DC  USA  20006

    De Leuw, Cather and Company

    L'Enfant Plaza North Building
    Washington, DC  USA 
  • Publication Date: 1975-8-14

Media Info

  • Pagination: 32 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00093092
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: MRWJ-75-138, #14
  • Files: TRIS
  • Created Date: Dec 3 1981 12:00AM