TECHNICAL INFORMATION PAMPHLET ON FIBROUS CONCRETE OVERLAYS--FORT HOOD PROJECT

The first full-scale nonexperimental placement of a steel fibrous concrete overlay was completed in March 1974 at Fort Hood Tex. This report details the placement procedures used on the Fort Hood project and recommends other suitable techniques. Design considerations and specification modifications are also discussed. The results of cost and preliminary performance evaluations of the Fort Hood overlay are presented. covering abstract of the conference is IRRD abstract no 213776. /TRRL/

  • Corporate Authors:

    Army Construction Engineering Research Laboratory

    School of Civil Engineering, P.O. Box 1
    Champaign, IL  United States  61820
  • Authors:
    • Williamson, G R
  • Publication Date: 1975-8

Media Info

  • Features: Figures; References; Tables;
  • Pagination: 19 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00127733
  • Record Type: Publication
  • Report/Paper Numbers: CERL TR M-147 Final Rpt.
  • Contract Numbers: 4A764717D895-04-008
  • Files: TRIS
  • Created Date: Dec 29 1975 12:00AM