CENTRAL SUBSTATION KARLSRUHE WEST GERMANY. A MILESTONE IN THE HISTORY OF RAILROAD POWER SUPPLY

DIE ZENTRALSCHALTSTELLE KARLSRUHE. EIN MEILENSTEIN IN DER GESCHICHTE DER BAHNSTROMVERSORGUNG

For centralization, increase of the supply reliability and reduction of staff, a computer-controlled central substation for the operation of the 15-kv-overhead system network has been installed at Karlsruhe. The remote-controlled area will comprise in the final stage 15 substations, 3 sectioning points, 7 paralleling points and 250 stations with 4000 switches. The hardware is formed, among others, by a process data processor with simplex configuration. The software includes operating system, utility programs and user programs. Routine switching actions are predominantly automated. The switching is realized by monitor control but a mosaic switchboard serves as fall back installation.

  • Corporate Authors:

    Verlag R Oldenbourg

    Rosenheimer Strasse 145
    Munich 80,   Germany 
  • Authors:
    • Orzeszko, S
  • Publication Date: 1984-10

Language

  • German

Media Info

  • Features: References;
  • Pagination: 9 p.
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00455211
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: May 31 1986 12:00AM