TEST PLAN FOR ACCEPTANCE, VERIFICATION AND PERFORMANCE TESTING OF THE BEDFORD LUCAS CHLORIDE ELECTRIC VAN. PART 1 ACCEPTANCE AND VERIFICATION TESTING AT EG AND G AUTOMOTIVE RESEARCH. PART 2 INEL PERFORMANCE TESTING. REVISION 1

Part 1, the acceptance and verification tests, are being performed in accordance with the Society of Automotive Engineers (SAE) Electric Vehicle Test Procedure J227a, and are intended to demonstrate conformance with Title 10, Part 475 of the US Code of Federal Regulations (10 CFR 475). Environmental tests will also be performed at International Harvester Corporation in Hinsdale, Illinois. Part 2, the performance testing, is being performed at the Electric Vehicle Testing Laboratory of Idaho Falls, Idaho. These tests are also being performed in accordance with the SAE J227a procedure and are primarily dynamometer tests that are intended to provide performance data under controlled laboratory conditions. (ERA citation 10:018620)

  • Supplemental Notes:
    • Portions of this Document are Illegible in Microfiche Products.
  • Corporate Authors:

    EG and G Idaho, Incorporated

    P.O. Box 1625
    Idaho Falls, ID  United States  83401
  • Authors:
    • Knauts, H E
    • Heiselmann, H W
    • MACDOWALL, R D
  • Publication Date: 1984-11

Media Info

  • Pagination: 137 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00450197
  • Record Type: Publication
  • Report/Paper Numbers: EGG-SE-6750-Rev 1
  • Files: TRIS
  • Created Date: Aug 27 2004 8:57PM