NEW CONCRETE-TIE SERVICE TEST FOR THE SANTA FE

Since late in 1974, Santa Fe trains have been operating over a concrete-tie test section which is reported to represent the latest in concrete-tie technology as learned from previous test sections on this road and from other sources. Two types of ties and several types of fastenings were used in a segment of the mainline in Illinois. Special attention was given to providing a subgrade and ballast bed which would give maximum support to the ties which will be subjected to 20 million gross tons annually with trains operating at up to 79 mph.