PUMPED CONCRETE THE KEY ON M5 BRIDGE BUILDING

Details are given of the methods and equipment used for the construction of 41 prestressed and reinforced concrete bridges on the 26.5 km stretch of the M5 motorway in Gloucestershire. /IRRD/

  • Availability:
  • Corporate Authors:

    IPC Building and Contract Journals Limited

    32 Southwark Bridge Road
    London SE1 9EX,   England 
  • Publication Date: 1971

Media Info

  • Features: Photos;
  • Pagination: p. 616-617
  • Serial:
    • CONTRACT JOURNAL
    • Volume: 242
    • Issue Number: 797
    • Publisher: Reed Business Information, Limited
    • ISSN: 0010-7859

Subject/Index Terms

Filing Info

  • Accession Number: 00081775
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: ITRD, TRIS
  • Created Date: Jul 15 1975 12:00AM