THE DEVELOPMENT OF BRIDGE CONSTRUCTION IN EAST GERMANY

DIE ENTWICKLUNG DES DR-BRUECKENBAUS

THE BRIDGE STRUCTURES BUILT IN EAST GERMANY AFTER THE WAR ARE DISCUSSED, REFERENCE BEING MADE TO THE REBUILDING OF ARCH BRIDGES AND VIADUCTS AND TO THE CONSTRUCTION OF NEW BRIDGES USING MODERN METHODS. THE FIRST PRESTRESSED CONCRETE BRIDGE WAS BUILT IN 1960. A DESCRIPTION IS GIVEN OF STRUCTURES REPAIRED OR RE-BUILT IN BERLIN.

  • Corporate Authors:

    VEB Autobahnbaukombinat

    Templinestrasse 19
    Potsdam,   Germany 
  • Authors:
    • Dietrich, W
  • Publication Date: 1972

Language

  • German

Media Info

  • Features: Figures;
  • Pagination: p. 298-300
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00080567
  • Record Type: Publication
  • Source Agency: Bundesanstalt für Straßenwesen (BASt)
  • Files: ITRD, TRIS
  • Created Date: Mar 26 1975 12:00AM