PREPARATORY WORK AND THE FIRST PHASE OF TEST IMPLEMENTATION FOR THE STUDY OF RAIL RAPID TRANSIT

VORBERITUNG UND DURCHFUEHRUNG DER VERSUCHE FUER SCHIENENSCHNELLVERKEHR

As part of a research program dealing with the limits of the wheel/rail system, tests were carried out on the German Federal Railway's test rack by means of a locomotive-hauled test train (locomotive 103 118 and 3 test cars) in the speed range above 200 km/hr. These successful test runs provided the basis on which systematic component research is being continued.

  • Availability:
  • Corporate Authors:

    Siemens (Georg) Verlagsbuchhandlung

    Luetzowstrasse 105-196
    1 Berlin 30,   Germany 
  • Authors:
    • Haefner, F
    • Hasselhuhn, J
    • Weidlich, E
  • Publication Date: 1974-9

Language

  • German

Media Info

  • Features: References;
  • Pagination: p. 299-309
  • Serial:
    • Glasers Annalen ZEV
    • Volume: 98
    • Issue Number: 9
    • Publisher: Siemens (Georg) Verlagsbuchhandlung
    • ISSN: 0373-322X

Subject/Index Terms

Filing Info

  • Accession Number: 00080353
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Feb 11 1981 12:00AM