SUBSURFACE INVESTIGATION, SECTION E001, GREENBELT ROUTE

Results are summarized of four supplementary test borings made in Section E001 of Greenbelt Route of the Washington Metropolitan Area Metro system near the Intersection of Florida Avenue with U Street N.W. in downtown Washington, D.C. The purpose of the exploration was to obtain additional information on the position and irregularities in the surface of decomposed rock and bedrock which is near to METRO tunnel openings. The report contains a revised geological section incorporating the borings, logs of the test borings, results of laboratory identification testing and comments on the possible character of the materials to be intersected by the tunnels. The work supplements Report No. MRWJ-74-107 which summarized previous exploration in Section E001.

  • Supplemental Notes:
    • Prepared in cooperation with De Leuw, Cather and Co., Inc., Washington, D.C.
  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  United States 

    Washington Metropolitan Area Transit Authority

    950 l'Enfant Plaza, SW
    Washington, DC  United States  20006

    De Leuw, Cather and Company, Incorporated

    1030 15th Street, NW
    Washington, DC  United States  20036
  • Publication Date: 1975-2-4

Media Info

  • Pagination: 20 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00090985
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: MRWJ-75-123, No. 3
  • Files: TRIS
  • Created Date: Jun 26 1975 12:00AM