SUBSURFACE INVESTIGATION, SECTION G001, ADDISON ROUTE

Results are summarized of three supplementary test borings made for the investigation of subsoil conditions in Section G001 of Addison Route at the crossing of the planned METRO tunnels beneath the Penn Central Railroad trackage near the intersection of Benning Road and Interstate 295 of the Washington Metropolitan Area Metro system. The report contains a section across the METRO tunnels which incorporates boring and laboratory test information, logs of the supplementary test borings, and a text commenting on subsurface conditions.

  • Supplemental Notes:
    • Prepared in cooperation with De Leuw, Cather and Co., Inc., Washington, D.C.
  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  USA 

    Washington Metropolitan Area Transit Authority

    950 l'Enfant Plaza, SW
    Washington, DC  USA  20006

    De Leuw, Cather and Company, Incorporated

    1030 15th Street, NW
    Washington, DC  USA  20036
  • Publication Date: 1975-1-30

Media Info

  • Pagination: 20 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00090984
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: MRWJ-75-124, No. 4
  • Files: TRIS
  • Created Date: Jun 26 1975 12:00AM