SUBSURFACE INVESTIGATION, SECTION K007, VIENNA ROUTE

Results are summarized of 125 testborings and 8 test pits made for the investigation of subsoil conditions in Section K007 of Vienna Route of the Washington Metropolitan Area Metro System generally between DunnLoring and Vienna Stations along Interstate I-66 west of its intersection with the Capital Beltway. The report contains geological sections along the line of the METRO construction and for a number of ancillary structures and locations surrounding the stations, logs of the supplementary test borings, results of laboratory tests on undisturbed samples, and comments on anticipated design and construction problems.

  • Supplemental Notes:
    • Prepared in cooperation with De Leuw, Cather and Co., Inc., Washington, D.C.
  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  United States 

    Washington Metropolitan Area Transit Authority

    950 l'Enfant Plaza, SW
    Washington, DC  United States  20006

    De Leuw, Cather and Company, Incorporated

    1030 15th Street, NW
    Washington, DC  United States  20036
  • Publication Date: 1975-2

Media Info

  • Pagination: 152 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00090981
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: MRWJ-75-122
  • Files: TRIS
  • Created Date: Jun 26 1981 12:00AM