REHABILITATION OF CHAMBAL BRIDGE

This Paper describes about rehabilitation measures undertaken for the Road Bridge Across River Chambal near Etawah in Uttar Pradesh, India. The work was sub-contracted by Uttar Pradesh State Bridge Corporation Limited to the Freyssinet Prestressed Concrete Company, Limited. It mainly deals in detail with the novel technique adopted for lifting and rotating a prestressed concrete suspended span of 40.55 metre length about its rocker end, to restore it to original position and to reset roller bearings and replace some of its parts. The work was carried out with minimum hindrance to traffic. (Author)

  • Availability:
  • Corporate Authors:

    Indian Roads Congress

    Jamnagar House, Shahjahan Road
    New Delhi,   India  110 011
  • Authors:
    • Rohra, M R
    • Saxena, N C
    • Pherwani, S H
  • Publication Date: 1984-9

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00395931
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Sep 30 1985 12:00AM