HOW THE AUSTRIANS CRACKED THE HARD AMERICAN NUT WITH NATM

A breakthrough for the New Austrian Tunnelling Method has occurred in the USA, where a contract to construct 2500m of twin running tunnels and twin 210m-long station tunnels is currently underway for the Washington DC metro. A fully welded pvc plastic liner is included to solve water problems which have occurred in other contracts on the project.