CALIFORNIA'S THIN BONDED PCC OVERLAY

Details of a thin bonded PCC overlay of a 17 year old PCC pavement are presented. The location was on I-80 near Truckee at 6500-7000 ft elevation. Due to the extent of bond failure, the project is considered to have "failed", and was overlaid with AC. Results of the failure investigation to date are also given. (FHWA)

Media Info

  • Pagination: n.p.

Subject/Index Terms

Filing Info

  • Accession Number: 00392212
  • Record Type: Publication
  • Report/Paper Numbers: FHWA-CA-Tl-83-04 Intrm Rpt.
  • Contract Numbers: F81TL03
  • Files: TRIS, ATRI, USDOT, STATEDOT
  • Created Date: Feb 28 1985 12:00AM