URBAN RAPID TRANSIT SYSTEM RHEIN (RHINE)-RUHR, WEST GERMANY. INSTALLATION OF ELECTRIC EQUIPMENT FOR PUTTING INTO OPERATION THE LINE SEGMENT BOCHUM MAIN STATION-DORTMUND MAIN STATION

S-BAHN RHEIN-RUHR. BAUMASSNAHMEN AN ELEKTROTECHNISCHEN ANLAGEN ZUR INBETRIEBNAHME DES STRECKENABSCHNITTS BOCHUM HBF - DORTMUND HBF

In September 1983 the S-Bahn traffic has been inaugurated on the line s 1 with a length of 22 km between Bochum main station and Dortmund main station. Due to reconstructions extensive work at the electric installations had to be carried through. A description is given of the electric installations like switching stations, substations, overhead contact system and points heating. The 50-Hz-installations comprise the power supply including emergency power plants and lighting. Further work will follow due to the extension of the lines s 2 and s 4 untile autumn 1987.

  • Corporate Authors:

    Verlag R Oldenbourg

    Rosenheimer Strasse 145
    Munich 80,   Germany 
  • Authors:
    • Sieverling, H
  • Publication Date: 1983-9

Language

  • German

Media Info

  • Features: References;
  • Pagination: 4 p.
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00386980
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Aug 30 1984 12:00AM