TRAFFIC SIMULATOR DESIGNED FOR THE TEST OF ROUTE SETTING SYSTEM

A computer-controlled route setting system is part of the Centralized Traffic Control system installed on the Musashino line of the JNR. Test of the route setting had to be accomplished without disturbing the CTC system and affecting operation of trains. The authors designed a traffic simulator which employed a computer, software of which issued traffic information for system testing. The article describes the development and function of the simulator.

  • Availability:
  • Corporate Authors:

    Ken-yusha, Incorporated

    1-45-6 Hikari-cho, Kokubunji-shi
    Tokyo,   Japan 
  • Authors:
    • Sasaki, T
    • Takaoka, H
  • Publication Date: 1974

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00057861
  • Record Type: Publication
  • Source Agency: Railway Technical Research Institute
  • Report/Paper Numbers: Quart. Rpt
  • Files: TRIS
  • Created Date: Nov 12 1974 12:00AM