LNG TERMINAL DESIGN

This paper presents guidelines for design of LNG receiving terminal for loading and unloading to insure safe, economical operation during transient conditions. Proper design must include evaluation of factors causing line hydraulic hammer, geysering, unwanted product vaporization during transfer and other detrimental features.

  • Corporate Authors:

    Gulf Publishing Company

    Box 2608
    Houston, TX  United States  77001
  • Authors:
    • Durr, C A
    • Crawford, D B
  • Publication Date: 1973-11

Media Info

  • Features: References;
  • Pagination: 4 p.
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00054841
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Jul 15 1974 12:00AM