NEW STATIONS BUILT DURING ELECTRIFICATION OF THE NOISY-TOURNAN LINE

DES GARES NOUVELLES SUR LA LIGNE NOISY-TOURNAN

The author, Ingenieur Principal Hors Classe, Head of the Equipment Division, Paris-East Region, refers in this article to the alterations made to station buildings and the new stations constructed on this section of the Paris-Mulhouse line, running through the Paris suburbs, while it was being electrified; all the work carried out had become indispensable because of the increased population and property development in this area which has seen a growth rate these past few years that will probably be exceeded in the future. The author then explains the general ideas that governed the studies of all types, as well as the motivation, nature and characteristics of the work, by considering in turn the four new halts and then the alterations made to the old passenger buildings in two stations. He concludes by underlining the efforts made by the SNCF to adapt facilities to requirements which, in this instance, have reduced the distance between stops by a half.

  • Corporate Authors:

    Societe Nationale des Chemins de Fer Francais

    92 rue Bonaparte
    75 Paris 6e,   France 
  • Authors:
    • Kleitz, H
  • Publication Date: 1973-10

Language

  • French

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00053830
  • Record Type: Publication
  • Source Agency: Revue Generale des Chemins de Fer
  • Files: TRIS
  • Created Date: Jun 3 1974 12:00AM