DB TESTS SLAB TRACK IN A 250 KM/H LINE
Concrete slab track was laid by DB in its first 200 km/h section in 1967. Settlement averaged 6 mm, and after six years it has ceased. Prof. Dr.-Ing. F Birmann describes further tests with two types of slab track now being subjected to 250 km/h running.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/03735346
-
Corporate Authors:
IPC Transport Press, Limited
Dorset House, Stamford Street
London SE1 9LU, England -
Authors:
- Birmann, F
- Publication Date: 1973-12
Media Info
- Features: Figures;
- Pagination: p. 474-475
-
Serial:
- Railway Gazette International
- Volume: 129
- Issue Number: 12
- Publisher: DVV Media Group
- ISSN: 0373-5346
- Serial URL: http://www.railwaygazette.com/about-us.html
Subject/Index Terms
- TRT Terms: Concrete; Concrete slab track; Concrete ties; Railroad ties; Railroad tracks
- Identifier Terms: Deutsche Bahn; Deutsche Bundesbahn
- Subject Areas: Materials; Railroads;
Filing Info
- Accession Number: 00051388
- Record Type: Publication
- Source Agency: Railway Gazette International
- Files: TRIS
- Created Date: Apr 26 1976 12:00AM