BRUNEI LNG PROJECT AHEAD OF SCHEDULE

Two of five liquefaction trains handling 300 MMscfd of feed gas are operating at the Lumut, Brunei, Borneo, LNG plant of Brunei LNG Ltd. Two more of like size will be operational by year-end. Fifth train will come on stream in 1974, boosting total capacity to 750 MMscfd for the $200-million project. Paper shows and discusses the flowsheet of the LNG plant and describes the liquefaction process, product storage, as well as the shiploading installation, ecompassing two 18-in. stainless steel loading lines, each about 2.5 mi long.

  • Availability:
  • Corporate Authors:

    Petroleum Publishing Company

    211 South Cheyenne, P.O. Box 1260
    Tulsa, OK  United States  75221
  • Authors:
    • Farrar, G L
  • Publication Date: 1973-9-17

Media Info

  • Features: References;
  • Pagination: p. 61-66
  • Serial:
    • Oil and Gas Journal
    • Volume: 71
    • Issue Number: 38
    • Publisher: PennWell Publishing Company
    • ISSN: 0030-1388

Subject/Index Terms

Filing Info

  • Accession Number: 00051095
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Feb 28 1974 12:00AM