EVERGREEN POINT BRIDGE MAINTENANCE PROBLEMS, 1975

This report completely describes the instrumentation on the drawspan of the Evergreen Point Bridge. The design and construction of the data recording system, with the complete calibration of the measurement and collection system is given. Initial data collection and preliminary analysis is set out. The analysis was subsequently abandoned, the data was retained.

Media Info

  • Pagination: 60 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00347730
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: WA-RD-44.2
  • Files: STATEDOT
  • Created Date: Feb 27 2002 12:00AM