LIGHT ADAPTATION PROBLEMS WHEN LEAVING A SUBWAY TUNNEL

LICHTADOPTATIEMOEILIJKHEDEN BIJ HET UITKOMEN VAN METROTUNNELS

The problems of light adaptation when leaving an unlit subway tunnel can be solved in different ways. For the specific case of a tunnel at the planned new subway station "Kralingse Zoom" at Rotterdam-East these possibilities are described. It is recommended to screen the bright parts of the sky visible between the platform roofs before and after leaving the tunnel.(a)

  • Corporate Authors:

    Instituut voor Zintuigfysiologie, TNO

    Kampweg 5
    Soesterberg,   Netherlands 
  • Authors:
    • Ellens, E
    • Leebeek, H J
  • Publication Date: 1978

Language

  • Dutch

Media Info

  • Features: Figures; Photos;
  • Pagination: 8 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00341724
  • Record Type: Publication
  • Source Agency: Institute for Road Safety Research, SWOV
  • Report/Paper Numbers: No. 1978-C30 Monograph
  • Files: ITRD, TRIS
  • Created Date: Oct 28 1981 12:00AM