VISUAL CONFIRMATION OF VOICE TAKEOFF CLEARANCE (VICON) OPERATIONAL EVALUATION. VOLUME II. OPERATIONS AND MAINTENANCE MANUAL

This document is Volume II of the Visual Confirmation of Voice Takeoff Clearance (VICON) Operational Evaluation. It contains working drawings and schematic diagrams, technical details, and maintenance and detailed operational procedures for the VICON system that was installed at Bradley International Airport, Windsor Locks, Connecticut. The drawings, instructions, and charts in this volume are reproduced exactly as they were used by the Bradley maintenance and air traffic control specialists; no effort was made to formalize or improve the appearance of this information. This volume, therefore, would be utilized if one is interested in considering future implementation or design modification of the VICON system. Seven appendices were added in order to consolidate under one cover the various operational, maintenance, and design details for the VICON system and its components.

  • Supplemental Notes:
    • See also Volume 1, AD-A097 756.
  • Corporate Authors:

    Federal Aviation Administration

    William J. Hughes Technical Center, Airport Technology Research and Development Branch
    Atlantic City International Airport
    Atlantic City, NJ  United States  08405

    Federal Aviation Administration

    800 Independence Avenue, SW
    Washington, DC  United States  20591
  • Authors:
    • Maurer, J J
    • Castle, B
    • Novakoff, A K
    • Nelson, R
    • Roditi, S
  • Publication Date: 1981-2

Media Info

  • Pagination: 284 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00337233
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: FAA-CT-80-60-2, FAA-RD-80-114-2
  • Files: NTIS, USDOT
  • Created Date: Aug 15 2003 12:00AM