THE PARIS UNDERGROUND RAILWAY: THE EXTENSION OF LINE A OF THE REGIONAL EXPRESS NETWORK (RER) AT TORCY
METRO DE PARIS: LE PROLONGEMENT A TORCY DE LA LIGNE A DU RESEAU EXPRESS REGIONAL
This extension is 9 km long from the present terminus at Noisy-le-Grand Mont and comprises 4 stations, each serving a sector of the new town of Marne-la-Vallee. Along most of the line, the construction of the RER precedes urban development thus benefiting from privileged conditions as regards alignment and ease of construction. To limit nuisances, the railway line is built mainly in cuttings in marl and marl-limestone layers surrounded by the water table. Approximately twenty structures were necessary to link the planned road network, including a 570 m-long viaduct with noise barriers. The whole construction period will last 30 months, the total cost will be 400 million francs.
-
Corporate Authors:
Federation Nationale des Trav Publ & des Synd Aff
6 Avenue Pierre Premier de Serbie
Paris 16e, France -
Authors:
- Taillebois, A
- Publication Date: 1980-7-8
Language
- French
Media Info
- Features: Figures; Photos;
- Pagination: p. 48-62
-
Serial:
- Travaux
- Publisher: Federation Nationale des Trav Publ & des Synd Aff
Subject/Index Terms
- TRT Terms: Alignment; Bridges; Carriers; Costs; Cutting (Earthwork); Drainage; Embankments; Excavations; Mechanically stabilized earth; Prevention; Railroad construction; Railroad stations; Rapid transit; Sound; Structures; Subgrade (Pavements); Subways; Transportation planning; Urban transportation; Water table
- Identifier Terms: Paris Metro
- Uncontrolled Terms: Longitudinal profile
- Geographic Terms: France; Paris (France)
- ITRD Terms: 2894: Alignment; 3455: Bridge; 224: Cost; 2812: Cutting (earthworks); 2937: Drainage; 2801: Embankment; 3355: Engineering structure; 1124: Line (transp); 2825: Longitudinal profile; 9149: Prevention; 3349: Reinforced earth; 6748: Sound; 2950: Subgrade; 4394: Water table
- Subject Areas: Bridges and other structures; Construction; Finance; Geotechnology; Hydraulics and Hydrology; Planning and Forecasting; Public Transportation; Railroads; Security and Emergencies; Terminals and Facilities; I21: Planning of Transport Infrastructure; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00334722
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Report/Paper Numbers: No. 545/546
- Files: ITRD, TRIS
- Created Date: Jul 9 1982 12:00AM