USE OF THE ELECTRONIC COMPUTER IN THE DESIGN OF THE ELECTRIC CENTRAL ROUTING CONTROL POINT: FIRST PHASE--DEFINITION OF THE TABLE OF INCOMPATIBILITIES BETWEEN THE ROUTINGS

IMPIEGO DELL'ELABORATORE ELETTRONICO AL PROGETTO DELL'APPARATO CENTRALLE ELETTRICO AD ITINERARI: 1A FASE DEFINIZIONE DELLA TABELLA DELLE INCOMPATIBILITA TRA GLI ITINERARI

The procedure, named PRACEI, is suitable to represent any station, no matter how complex, also of networks which do not adopt FS diagrams and circuits, in that it is based solely on geometric elements, like track and point circuits, present in all types of installations. The PRACEI procedure has been applied with satisfactory results, to ACEI (electric central routing control points) already in operation for the definition of the table of incompatibilities between the routings.

  • Corporate Authors:

    Collegio Ingegneri Ferroviari Italiani

    Via Giolitti 34
    Rome,   Italy 
  • Authors:
    • Rizzo, V
    • Naglieri, T
    • Franchi, G
  • Publication Date: 1980-5

Language

  • Italian

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00334304
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Jun 12 1981 12:00AM