STABILIZATION OF THE UPPER PORTION OF THE HAT CREEK LANDSLIDE
Hat Creek Landslide, located on U.S. Highway 95 near the town of Pollock, Idaho, started moving on January 27, 1974. The slide closed U.S. Highway 95 and the toe impinged into the Little Salmon River. The slide was about 2,300 by 500 feet and involved about one million cubic yards of material. Investigation and analysis centered around four alternatives: complete removal, lower slide removal, upper slide removal, and stabilization of the upper slide with groundwater control. The stabilization of the upper slide by groundwater control was selected as the most cost-effective alternative. A construction dewatering system, consisting of 45 eductor well points, was installed to provide a stable trench excavation. A drain trench, 700+ feet long, was constructed across the head of the slide. The drain trench contained 6-inch perforated pipe and 10-inch collector drain pipe covered by 4-1/2 feet of filter material. The stabilization work was completed in November, 1977 and realignment of U.S. Highway 95 in the fall of 1978 for a total cost of $770,000. (Author)
-
Supplemental Notes:
- Proceedings of the Eighteenth Annual Engineering Geology and Soils Engineering Symposium, held at the Red Lion Inn, Boise, Idaho.
-
Corporate Authors:
Idaho Transportation Department
3311 W State Street, P. O. Box 7129
Boise, ID United States 83707-1129University of Idaho, Moscow
Department of Geology and Geological Engineering
Moscow, ID United States 83844-3025Boise State University
Department of Geology and Geophysics
Boise, ID United StatesIdaho State University, Pocatello
Department of Geology
Pocatello, ID United States 83201Idaho State University, Pocatello
Department of Geology
Pocatello, ID United States 83201 -
Authors:
- Charboneau, R G
- Kuenzli, J R
- Ramage, J
- Conference:
- Publication Date: 1980-4
Media Info
- Features: Figures; References; Tables;
- Pagination: p. 61-80
Subject/Index Terms
- TRT Terms: Alignment; Dewatering; Groundwater; Landslides; Road construction; Soil stabilization; Trenches
- Uncontrolled Terms: Realignment; Stabilization
- Old TRIS Terms: Groundwater control
- Subject Areas: Geotechnology; Highways; I42: Soil Mechanics;
Filing Info
- Accession Number: 00334059
- Record Type: Publication
- Files: TRIS, STATEDOT
- Created Date: Sep 16 1981 12:00AM