CEMENT TREATED SUBBASE PLACED AT 400 CU. YD. PER HOUR
The paper reports that a double drum concrete batch plant, a pair of heavy duty spreader trimmers, and an unusual team of pneumatic and steel rollers have made possible to place cement treated subbase at rates of 400 cu. yd. per hour.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/03620506
-
Corporate Authors:
Technical Publishing Corporation
1301 South Grove Avenue
Barrington, IL United States 60010 - Publication Date: 1980-10
Media Info
- Pagination: p. 72
-
Serial:
- Highways and Heavy Construction
- Volume: 123
- Issue Number: 10
- Publisher: Cahners Publishing Company
- ISSN: 0362-0506
Subject/Index Terms
- TRT Terms: Base course (Pavements); Cement treated soils; Concrete; Construction equipment; Pneumatic equipment; Road construction; Road materials; Roads; Rollers; Soil cement; Soil stabilization; Soils; Subbase (Pavements)
- Uncontrolled Terms: Cement treated bases; Stabilization; Subbase
- Old TRIS Terms: Pneumatic rollers
- Subject Areas: Construction; Geotechnology; Highways; Maintenance and Preservation; Vehicles and Equipment; I52: Construction of Pavements and Surfacings; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 00331810
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Aug 15 1981 12:00AM