COAL LOADING PIER IN SVEA, SVALBARD

In connection with the development in the Svea mines at Svalbard a coal loading pier will be built. ... The ship loader with a 2000 tons/h capacity is placed on a cellular pile pier with fill. This solution seems to meet the requirements determined by local geotechnical and ice conditions, and the other specific design criteria of the project. (Author)

Media Info

  • Features: References;
  • Pagination: p. 217-232

Subject/Index Terms

Filing Info

  • Accession Number: 00331679
  • Record Type: Publication
  • Source Agency: Arctic Science and Technology Information System
  • Report/Paper Numbers: Volume 3 Conf Proc
  • Files: TRIS
  • Created Date: Jun 12 1981 12:00AM