SUITE OF PROGRAMS FOR OPTIMIZING ROAD DESIGN. PART VI. PARTIAL SHIFT OF HORIZONTAL ALIGNMENT

PROGRAMMSYSTEM ZUR OPTIMIERUNG DES STRASSENENTWURFS. TEIL VI: PARTIELLE VERSCHIEBUNG DER LINIENFUEHRUNG IM LAGEPLAN

Based on the results of previous phases in the development of a highway design optimization program, the feasibility of making a partial shift in the horizontal alignment needed to be investigated. For this purpose new models and further elements in the system were developed which allowed for such a shift to be made in conjunction with optimization of the vertical alignment hitherto undertaken. The heart of the work lay in the development of the model. The development of the system was carried out taking account of the integrated data flow required. The new element of the system was subjected to an extensive series of tests. The results of these tests indicated the possibilities and limitations of making a partial shift, for which purpose a practical method is submitted. (TRRL)

  • Availability:
  • Corporate Authors:

    Bundesminister fuer Verkehr

    ABT. Strassenbau, Lennestrasse 30
    D-5300 Bonn,   Germany 
  • Authors:
    • Amkreutz, J
  • Publication Date: 1977

Language

  • German

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00330269
  • Record Type: Publication
  • Source Agency: Bundesanstalt für Straßenwesen (BASt)
  • Report/Paper Numbers: Mong Ser
  • Files: ITRD, TRIS
  • Created Date: Aug 15 1981 12:00AM