RIGID PIPE PROOF TESTING UNDER EXCESS OVERFILLS WITH VARYING BACKFILL PARAMETERS: SECTION I, (VOLUME 2): CONCLUSIONS AND RECOMMENDATIONS, REINFORCED CONCRETE PIPE

This paper is a brief summary of observations, conclusions and recommendations for implementation is presented for the study of an 84-in. (2.14 m), reinforced concrete pipe at Cross Canyon. Included is a project "road-map," providing a directory to areas of the final report where more detailed information may be found. The study reiterated the structural advantage of pipe entrenchment in preconstructed embankment pads.

  • Supplemental Notes:
    • Work described herein was performed in conjunction with the research project entitled, "Rigid Pipe Testing Under Excess Overfills Using Varying Backfill Conditions."
  • Corporate Authors:

    California Department of Transportation

    Office of Structure Design, Division of Project Development
    Sacramento, CA  United States  95807
  • Authors:
    • Davis, R E
    • Semans, F M
    • Spannagel, D W
    • Bacher, A E
  • Publication Date: 1979-12

Media Info

  • Pagination: n.p.

Subject/Index Terms

Filing Info

  • Accession Number: 00331197
  • Record Type: Publication
  • Report/Paper Numbers: FHWA/CA/SD-79/17 Intrm Rpt., FCP 45I2-172