Alice Springs to Darwin rail connection - the dream becomes a reality

At this very event on September 14"‘, 2001 there was a paper given dealing with the design issues and providing an insight into the construction methodology of this project. When you look at the time line of the total project you realise that the construction was without doubt the most efficient part of the process which had the following components: - Conceived and promised by politicians at Federation; - Tenders, prepared by bureaucrats and closed January 1999; - Contract documentation driven by lawyers and bankers finally signed in April 2001, giving rise to the following simplified structure and scope.