THE STOCKHOLM UNDERGROUND, 1975
In connection with the opening of the central section--Slussen to Hotorget--of Line 1 of the Stockholm underground railway in 1957, and the inauguration of Line 2 in 1964, technical descriptions of the system were published. With the opening of the major part of the third line, the Jarva Line, yet another important stage in the extension of the underground network will have been completed. Since publication of the second technical description, the second line has also been extended to Botkyrka and to the University. Work is continuing on extensions to Lines 2 and 3. The present technical description has been produced in accordance with a decision reached by the Stockholm County Council Traffic Board, and it deals with the sections added most recently as well as with technically interesting aspects of previous construction work on the Underground. The object is to provide a concise but at the same time comprehensive documentation of the technical methods applied over about thirty years of underground railway construction.
-
Corporate Authors:
Stockholms Laens Landsting
P.O. Box 7841
Stockholm, Sweden -
Authors:
- Rosell, B
- Baeckstroem, I
- Ehrman, C
- Hillbom, B
- Publication Date: 1976-8
Media Info
- Pagination: 188 p.
Subject/Index Terms
- TRT Terms: Construction; Excavation and tunneling; Geological surveying; Metropolitan areas; Rapid transit; Rock mechanics; Subways; Technology; Translations; Transportation planning; Tunneling; Underground structures; Urban transportation
- Geographic Terms: Sweden
- Old TRIS Terms: Subway construction; Subway railways
- Subject Areas: Bridges and other structures; Construction; Public Transportation;
Filing Info
- Accession Number: 00328354
- Record Type: Publication
- Source Agency: National Technical Information Service
- Files: NTIS, TRIS
- Created Date: Apr 15 1981 12:00AM