CENTRALIZED PRECASTING CUTS COSTS
The operation of a small precasting plant turning out concrete segments for all of the structures required for a 160-mile tollroad program in southeastern France is outlined. The system consists of a pair of two-lane roadways, with a fifth one added on some viaducts. There are 2.4 miles of the twin-structure viaducts, some on high piers, and 3.8 miles of overpasses. One route has two, three-lane tunnels totaling 4 miles long.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/08919526
-
Corporate Authors:
McGraw-Hill, Incorporated
330 West 42nd Street
New York, NY United States 10036 - Publication Date: 1980-6
Media Info
- Pagination: p. 26-27
-
Serial:
- Engineering News-Record
- Volume: 204
- Issue Number: 26
- Publisher: McGraw-Hill, Incorporated
- ISSN: 0891-9526
Subject/Index Terms
- TRT Terms: Concrete construction; Concrete structures; Construction; Highways; Overpasses; Precast concrete; Road construction; Roads; Segmental construction; Systems; Tolls; Tunnels; Two lane highways; Viaducts
- Old TRIS Terms: Highway systems; Toll systems
- Subject Areas: Bridges and other structures; Construction; Highways; I52: Construction of Pavements and Surfacings;