The authors give a general description of the structure: history, selection of the alternative chosen, development of the plan. They give the main structural and design characteristics: continuous girders with 3 symmetrical spans simply resting on 4 bearings, 2 piers and 2 abutments. The length of the central span is 142,50 M, the total length of the structure 203 M. The deck consists of a prestressed lightweight concrete box girder varying in height with two webs having a total width of 10 M. The constructional aspects particular to the bridge are described. Mention is made of the lightweight concrete and characteristics required from the lightweight aggregates and concrete, concrete mix-design, acceptance tests, laying, results obtained. Site progress is briefly noted. (TRRL)

  • Corporate Authors:

    Federation Nationale des Trav Publ & des Synd Aff

    6 Avenue Pierre Premier de Serbie
    Paris 16e,   France 
  • Authors:
    • Duviard, M
    • Falempin, M
    • PLACIDI, M
    • VIRLOGEUX, M
    • Lemonier, G
    • Buisson, B
    • Bertrand, L
    • FAURE, P
  • Publication Date: 1979-7-8

Language

  • French

Media Info

  • Features: Figures; Photos; Tables;
  • Pagination: p. 200-32
  • Serial:
    • Travaux
    • Publisher: Federation Nationale des Trav Publ & des Synd Aff

Subject/Index Terms

Filing Info

  • Accession Number: 00324571
  • Record Type: Publication
  • Source Agency: Laboratoire Central des Ponts et Chausees (LCPC)
  • Report/Paper Numbers: Nos. 533/534
  • Files: ITRD, TRIS
  • Created Date: May 21 1981 12:00AM