TUNNEL WATERPROOFING

The report deals mainly with methods of waterproofing preformed segmental linings, and outlines the provisions for unlined tunnels and for waterproofing tunnels lined with concrete in-situ. The need (or otherwise) for watertightness is discussed, and recommendations are made, based upon existing evidence, for appropriate standards of permissible leakage, their formal classification, and suitable units of measurements. Factors are considered which may influence the selection of permanent waterproofing elements for a tunnel lining system, and an appreciation is made of construction expedients and temporary works which may be an equally essential part of waterproofing the tunnel. A classified list of waterproofing elements is given with suppliers' names and addresses.(a)

  • Availability:
  • Corporate Authors:

    Construction Industry Research & Information Assoc

    6 Storey's Gate
    London SW1P 3AU,   England 
  • Publication Date: 1979-4

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00323352
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • Report/Paper Numbers: CIRIA Rpt 81 Monograph
  • Files: ITRD, TRIS
  • Created Date: Jan 19 1981 12:00AM