NORTH DAKOTA TRAINS HAUL COAL TO POWER PLANT THROUGH A GIANT CULVERT

The article reports on the installation of a steel plate structure 170 ft long and 28.1 ft in span width, which serves as a grade separation near Beulah, N. D. Among the points covered are factors that led to the selection of this type of structure instead of a more conventional bridge structure, site preparation, installation backfilling, and other aspects of the project and the structure.

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00322838
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Dec 30 1980 12:00AM