LAYING BALLASTED TRACK ON LATTICE GIRDER BRIDGES

UEBERFUEHRUNG VON GLEIS UND BETTUNG BEI FACHWERKBRUECKEN

Using 2 examples each including 4 types of profile, a study is made of the problems involved in laying track and ballast on lattice girder bridges.

  • Availability:
  • Corporate Authors:

    Tetzlaff Verlag GmbH

    Havelstrosse 9, Postfach 4006
    D-6100 Darmstadt 1,   Germany 
  • Authors:
    • Kremling, L
  • Publication Date: 1980-3

Language

  • German

Media Info

  • Features: Figures; Photos; References; Tables;
  • Pagination: p. 87-90
  • Serial:
    • Signal und Draht
    • Volume: 24
    • Issue Number: 2
    • Publisher: Tetzlaff Verlag GmbH
    • ISSN: 0037-4997

Subject/Index Terms

Filing Info

  • Accession Number: 00322514
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Dec 30 1980 12:00AM