ANTWERPEN'S PRE-METRO TAKES SHAPE AS CONSTRUCTION SURGES AHEAD
Stage two of Line 1 opened on March 11 and Line 2 is being constructed using a bentonite shield to bore single-track tunnels one above the other.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/03735346
-
Corporate Authors:
IPC Transport Press, Limited
Dorset House, Stamford Street
London SE1 9LU, England -
Authors:
- Wittemans, A
- Publication Date: 1980-4
Media Info
- Features: Figures; Photos;
- Pagination: p. 279-282
-
Serial:
- Railway Gazette International
- Volume: 136
- Issue Number: 4
- Publisher: DVV Media Group
- ISSN: 0373-5346
- Serial URL: http://www.railwaygazette.com/about-us.html
Subject/Index Terms
- TRT Terms: Light rail transit; Streetcars; Transportation planning; Tunneling machines; Urban transportation
- Geographic Terms: Belgium
- Subject Areas: Construction; Public Transportation; Railroads;
Filing Info
- Accession Number: 00319965
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Dec 11 1981 12:00AM